World’s Largest waste incinerator to be fully operational next month

World’s Largest waste incinerator to be fully operational next month

The “world’s largest” waste incinerator will be up-and-running at full speed in a Beijing western suburb next month,

China Daily reported. The incinerator will be able to process 3,000 tons of household garbage per day, which equals around one-sixth of the daily domestic waste generated in China’s capital.

The Lujiashan incinerator, completed in 2012 at a cost of 2.1 billion yuan, just finished its year-long trial run and is ready to move into full operation. Before its construction, 80 percent of Beijing’s garbage was just poured into various landfills scattered across the city.

Now, household trash from Beijing’s Dongcheng, Xicheng, Fengtai, Shijingshan and Mentougou districts will be dumped into a 30-meter-deep treatment “pond” capable of handling up to 40,000 tons of waste at a time. There, the garbage will ferment for a week, China Daily goes into further detail,

The custom-built air-blast system will keep the atmospheric pressure in the pond lower than that outside and thus keep the smell of rotting garbage locked within the pond and spare the neighborhood of the stink. Also, the “fermentation” will increase the waste’s heat generation capacity by a large margin.

After the garbage “ferments”, mechanized buckets will dump it into four incinerators, which are actually waste heat boilers. The incineration will reduce the volume of the garbage by about 90 percent within a short time and the heat generated by the incineration can be transformed into electricity through two 30-megawatt air-cooling turbo-powered generators.

The local government had previously planned on building nine waste incinerators near Beijing by 2015, but local residents lobbied against it for fear of pollution. Before this one, only one small incinerator existed near the city.

However, the Beijing government, is calling the incinerator  “eco-friendly”.

Lujiashan can generate 420 million kilowatt hour of power in a year, which is equal to that generated by 140,000 tons of standard coal. Moreover, the more than 800 C temperature can eliminate dioxin, a carcinogenic pollutant and a byproduct of outmoded waste incineration technology, from the emissions.

Advanced environmental facilities “cleanse” the emissions from the incinerator in the high-voltage chimney which collects dust and pollutants, and ensures that the emitted fly ash meets national standards. Plus, the solid residue can be used as raw material in the cement industry.

However there is deep mistrust amongst the public for projects such as these, as Residents of a county in southern China recently  took to the streets in protest over the weekend to oppose a proposed garbage incineration plant, according to an article in the New York Times

← AECOM bags HK$248 mil contract to relocate sha tin sewage treatment works Investment in Hong Kong's infrastructure set to increase →

Comments are closed